The second offshore production test(Gas production test)April –July, 2017
- 1) Run in hole of Sand control
- 2) Run in hole of Sand Control and relating systems
- 3) Assembly of downhole production System
- 4) Downhole production system
- 5) Run in hole of downhole production system
- 6) Run in hole of downhole production system
- 7) Electric submersible pump
- 8) Annulus hose and Umbilical cable
- 9) Annulus hose and Umbilical cable
- 10) Subsea Well head
- 11) Preparation for Installation of Subsea well head
- 12) Descending of Riser pipe
- 13) Connection of Riser Pipe and EDP (Emergency disconnect package)
- 14) Installation of Subsea system
- 15) Installation of Subsea system
- 16) Surface flow tree
- 17) Production equipment on ship
- 18) Monitoring production data
- 19) Flare
- 20) Flare
- 21) Flare
- 22) Flare