The second offshore production test(Preparatory drilling)May –June, 2016
1) Attaching sensor on the casing
2) Preparation to install subsea wellhead for monitoring well
3) Subsea wellhead and casing
4) Preparation of LWD (Logging while drilling) at drill floor
5) Attaching pressure, temperature sensor cable on casing pipe
6) Descending subsea wellhead at moon pool
7) Conductor pipe
8) 26 inch drill bit
9) Preparation for installation of wellhead protection structure