The first offshore production test(Gas production Test) January – March, 2013
- 1) Working at drill floor
- 2) Drillers house
- 3) Preparation of Logging tools
- 4) Recovery of protection structure for production well
- 5) Retrievable Guideline less Re-entry Assembly(GRA)preparation
- 6) Descending of blowout preventer (BOP)
- 7) Descending of blowout preventer (BOP)
- 8) Descending of blowout preventer (BOP)
- 9) Descending of blowout preventer (BOP)-after arrival to seafloor
- 10) Flare boom installed on the vessel
- 11) Sand screen
- 12) Preparation of gravel for gravel pack
- 13) Run in hole of downhole production system
- 14) Run in hole of downhole production system
- 15) Passage of the front (march 10th)
- 16) Flare
- 17) Flare in evening(march 12th)
- 18) Flare in evening(march 12th)
- 19) Flare at night (march 12th)
- 20) Flare at night (march 13rd)
- 21) Recovery of GRA