The first offshore production test(Gas production Test) January – March, 2013
1) Working at drill floor
2) Drillers house
3) Preparation of Logging tools
4) Recovery of protection structure for production well
5) Retrievable Guideline less Re-entry Assembly(GRA)preparation
6) Descending of blowout preventer (BOP)
7) Descending of blowout preventer (BOP)
8) Descending of blowout preventer (BOP)
9) Descending of blowout preventer (BOP)-after arrival to seafloor
10) Flare boom installed on the vessel
11) Sand screen
12) Preparation of gravel for gravel pack
13) Run in hole of downhole production system
14) Run in hole of downhole production system
15) Passage of the front (march 10th)
16) Flare
17) Flare in evening(march 12th)
18) Flare in evening(march 12th)
19) Flare at night (march 12th)
20) Flare at night (march 13rd)
21) Recovery of GRA