The first offshore production test(Preparatory drilling) February – March, 2012
1) Preparation for departure (Drilling Vessel Chikyu)
2) Pre-job meeting before departure
3) Driller’s house at drill floor
4) Descending the drill pipe & bit
5) Installation of ROV
6) Attaching the acoustic communication tool on ROV
7) Drill pipe for drilling (9m)
8) Data analysis on the vessel
9) Preparation of subsea system
10) Drilling operations carried out around the clock
11) Drilling operations carried out around the clock
12) Attaching the sensor for temperature measurement
13) Logging tool